The sections are under the roof and we can start with producing. Each section (long 6m) be needed to notch on both sides, because ends are not ideally straight from manufacturing. Straight track lenghts with sleepers are rising gradually.

Completed tracks.
(photo © Tomas Randysek)

Completed tracks.
(photo © Tomas Randysek)

Ready-made sleepers.
(photo © Tomas Randysek)


Point welding of track lenghts.
(photo © Tomas Randysek)

Welders are well coordinated.
(photo © Tomas Randysek)

But situation about switches is more complicated. All parts of switch is neccesary to draw in detail at first, make and bend. And then all parts set together on the special work table. Try troublefree passability before final welding of all parts is the most important.

Drawing documentation.
(photo © Tomas Randysek)

Profiles grinding into final shape.
(photo © Tomas Randysek)

Passability testing on wheel gauge
127mm.
(photo © Tomas Randysek)