A spring is coming in these days and work on park railway started fully. You can see following photos, which capture situation from 23th March 2010. A building of track body between amphitheatre and reset loop was started by company Trasko. Groove of track body is excavating stepwise. Geotextile and robust drainage tube are lied aground. Groove is overhelm with rubble and it is compacted at the conclusion. Soakage pits are excavated every 50-70 meters.
Ground shaping are running concurrently, especially between tunnel and main station.

There is a rubble for squaring off
before the tunnel.
(photo © Tomas Randysek)

View into the tunnel.
(photo © Tomas Randysek)

In-line skating rink above the tun-
nel is waiting for cutting down.
(photo © Tomas Randysek)

Transport of mould from area between tunnel and main station.
(photo © Tomas Randysek)

Wetlands are drying-out after the winter - some more quickly, some more slowly ...
(photo © Tomas Randysek)

Area of the main station. There is
a mound between station and in-
-line skating rink on the right side.
(photo © Tomas Randysek)

Area of the round-house.
(photo © Tomas Randysek)

Building of track body - geotextile
and drainage tube are overhelm
with rubble stepwise. There is a
soakage pit underlying.
(photo © Tomas Randysek)

Triangulation.
(photo © Tomas Randysek)

Supply of rubble.
(photo © Tomas Randysek)

Station near amphitheatre.
(photo © Tomas Randysek)

Amphitheatre building.
(photo © Tomas Randysek)

General view.
(photo © Tomas Randysek)