A workers of the OK Mont company proceeding from the reset loop to the station near amphitheatre along an in-line skating rink. A straight section and two curves are welded. The firts switches for station near amphitheatre were take from Krenovice. And two level crossings over the footpath are building. Company Trasko is modulating a terrain and it is building a gravel ballast from the sideway station towards the main station. A terrain in the curves behind the bridge was modified.

The track lenghts welding.
(photo © Tomas Randysek)

A view into the mountain cliff
and the station near the
amphitheatre.
(photo © Tomas Randysek)

The track in a curve.
(photo © Tomas Randysek)

A new track section laying.
(photo © Tomas Randysek)

The first switches were take
at the building site.
(photo © Tomas Randysek)

OK Mont built two axle test wagon with a wheel base 2m and height about 500kg
and it try a passability with this wagon.

The test wagon.
(photo © Tomas Randysek)

A passage by the curve.
(photo © Tomas Randysek)

Detail of the wheel in the curve.
(photo © Tomas Randysek)

The building of a level crossing.
(photo © Tomas Randysek)

A level crossing near
the mountain cliff.
(photo © Tomas Randysek)

A view from the mountain cliff.
(photo © Tomas Randysek)

A gravell ballast laying.
(photo © Tomas Randysek)

A straight section along an in-line
skating rink.
(photo © Tomas Randysek)

A new soakage pit building.
(photo © Tomas Randysek)

A modified terrain around the wooden labyrinth.
(photo © Tomas Randysek)

Departure from below a bridge.
(photo © Tomas Randysek)

A modified terrain between
the main station and the bridge.
(photo © Tomas Randysek)

A general view at the park.
(photo © Tomas Randysek)

A boat from live osiers building.
(photo © Tomas Randysek)

A plant gardening.
(photo © Tomas Randysek)