|
|
|
|
|
|
The battery engines, 7" green AEG from depot Reckovice and 5" red AEG from depot
Krenowice, and four 5" passengers cars were used for a test runs.
Jirka Sajbrt made a special gauge for a curves measuring. We used a digital gauge
for a gradient measuring and a level yet. |
|
Jirka Sajbrt is coming out.
(photo © Tomas Randysek)
|
We have to fix the switch in a final position so that we could try
a passage by an increased speed.
(photo © Tomas Randysek)
|
A provisional lock of the switch.
(photo © Tomas Randysek)
|
|
|
A test runs were started. The bought trains were looking into passability by a slow
runs from the double-tracked station Amphitheatre into the reset loop. A regular
test revealed two embarrassments in the rail joints.
The first problem is a sunken rail joint which to happen while a welding, owing to
a material deformation. The next problem is a deformation of the rail joint in the
longitudinal direction. We searched the optimal resolution with OK Mont company
after the test runs.
We tested a passing through the switch by maximum speed, which is about 11 km/hod
with a battery engines. The run in a direct course and by a branch, along the spite
and against the spite were without problems. But steam engines can go with a double
speed. The track is not ready for steam engines operating with a passenger cars. |
|
The first test train is moving out ...
(photo © Tomas Randysek)
|
.. followed by the second train.
(photo © Tomas Randysek)
|
Mr Velecky as a passenger.
(photo © Tomas Randysek)
|
|
The test trains while a back run.
(photo © Tomas Randysek)
|
The test train with the engine driver Martin.
(photo © Tomas Randysek)
|
The test train with the engine driver Tomas.
(photo © Tomas Randysek)
|
|
The examining board is going on the track.
(photo © Tomas Randysek)
|
And here is the first problem - a sunken rail join in a longitudinal direction.
(photo © Tomas Randysek)
|
A deformation of the rail joint in a cross direction is evident at the first sight.
(photo © Tomas Randysek)
|
|
The test train is going on the track. You can see a deformation of the rail join.
(photo © Roman Siler)
|
Jirka Sajbrt as the engine driver.
(photo © Tomas Randysek)
|
Martin and Roman Siler are going on the track.
(photo © Tomas Randysek)
|
|
|
The deputies of OK Mont tried to drive the battery engine, too.
(photo © Tomas Randysek)
|
|
The final discussion about incurred problems.
(photo © Tomas Randysek)
|
|
|
We must loading our models into cars after the test runs.
(photo © Roman Siler)
|
|
|
You can see a short video from the test runs:
|
|
Format .wmv (size 6.5MB)
|
Format .avi (size 105MB)
|
|
|
|