|
|
|
|
|
|
We planned a demonstration runs with steam engines for Olympia management and
other concerned parties which are participate in the biocentre building. It was
was raining from the early morning and we had to decide, if we loading our vehicles
from a store. But we took chance and we went into Olmypia. The highest master railman
took pity on us and rain was stopped finally. We pulled out a steam engines and
we started to fire up. This working was quite difficult because the rain totally
soak a terrain. The steam engines SOLINGEN, PONAVA and KRZENOWIC were set to
demonstration runs. |
|
|
The deputies of Olympia appeared at the first. A good temper governed in spite of
weather. Especially ladies looked forward to runs. |
|
An inquisitive questions of the passengers.
(photo © Tomas Randysek)
|
"Aboard train into reset loop and back!"
(photo © Tomas Randysek)
|
Filling up the oil before departure.
(photo © Tomas Randysek)
|
|
The train departure from the station Amphitheatre.
(photo © Tomas Randysek)
|
In an incision before crossing.
(photo © Tomas Randysek)
|
The departure from a reset loop.
(photo © Tomas Randysek)
|
|
|
The deputies of ArchDesign company appeared consequently - Mr Kapsa and Mrs Dadakova
with her children. They are the main authors of integration our park railway in the
biocentre. So they could try to went through along their curves which they designed
into drawings. |
|
Mrs Dadakova with her children.
(photo © Tomas Randysek)
|
Mr Kapsa.
(photo © Tomas Randysek)
|
|
The arrival into reset loop.
(photo © Tomas Randysek)
|
In the reset loop.
(photo © Tomas Randysek)
|
|
Jirka Sajbrt with his Solingen drives down next passengers.
(photo © Tomas Randysek)
|
|
|
We tested the railway route after demonstartion runs yet. I reached speed 16 km/h
with steam engine (as measured by mobile GPS transceiver). But commercial trains
will run about 10 km/h at the most. |
|
The steam engines Solingen and Krzenowic.
(photo © Tomas Randysek)
|
The steam engine Ponava.
(photo © Tomas Randysek)
|
The steam engine Krzenowic.
(photo © Tomas Randysek)
|
|
|
The steam engines Solingen, Krzenowic and Ponava while a pasage by the reset loop.
This place will the best for photography of the trains, because an object lens
is directly in the level of rails.
(photo © Tomas Randysek)
|
|
|
We coupled all three locomotives and we tried run this triplet eventually, which
we could not undertake in Karlsruhe. A view on this train certainly delight ... |
|
(photo © Tomas Randysek) |
(photo © Tomas Randysek) |
(photo © Tomas Randysek) |
|
(photo © Tomas Randysek) |
|
Solingen and his satisfied engine driver.
(photo © Tomas Randysek)
|
The arrival of the last train this day into station Amphitheatre.
(photo © Tomas Randysek)
|
|
|
|