We gradually start to works on the main station. Area of the main station was fenced. Site excavation of depot, station building and workshop started too. Ytong bricks were delivered into buffer stock PASO a.s. Workers of Velecky company made provisional branch from track before a bridge into container, for easier manipulation with vehicles.

Settlement of fence stakes.
(photo © Tomas Randysek)

Marked axe for depotm, station building and workshop foundations excavating.
(photo © Tomas Randysek)

We have to implement site
excavation by handmake
alongside fence.
Jano is excavating and
excavating ...
(photo © Tomas Randysek)

... and Stefan is loading and
shiping off an earth.
(photo © Tomas Randysek)

Provisional gate to the site.
(photo © Tomas Randysek)

There is a bridge without upper arches. Inside and part of portales were painted by dark grey colour.
(photo © Tomas Randysek)

Site excavation with the help of building machine.
(photo © Tomas Randysek)

Dredged depot foundations.
(photo © Tomas Randysek)

Unloading of brickwork Ytong in the buffer stock.
(photo © Tomas Randysek)

Prepared track lenghts.
(photo © Tomas Randysek)

Welding of the track lenghts.
(photo © Tomas Randysek)

A curve forming.
(photo © Tomas Randysek)

Ballast filling.
(photo © Tomas Randysek)

Branche into container.
(photo © Tomas Randysek)