Number of visitors:


Events:

Optimizedfor browser:

Lokality návštěvníků našich stránek

A basement of the station building isolation.
(photo © Tomas Randysek)

A building of the depot.
(photo © Tomas Randysek)

The enclosure walls of the workshop are built.
Jano and Pista are preparing a lintels above windows.
A roofing of the depot continued, a shingel was glued onto the battens.

Jano and Pista.
(photo © Tomas Randysek)

A walling of the workshop
enclosure walls.
(photo © Tomas Randysek)

A walling of the workshop
enclosure walls.
(photo © Tomas Randysek)

Carry of a lintels.
(photo © Tomas Randysek)

A roofing of the depot.
(photo © Tomas Randysek)

The information board for visitors
so they know what we make
behind the green fence.
(photo © Tomas Randysek)

The workshop has built an enclosure walls, a rim was concreted and a roof frame will laid. A traverse in a place of the portal gate was concreted. A walling of the station building is proceeding. The depot roof was pawe with a shingel and a side walls are facing by a thick chipboards.

A building of the workshop.
(photo © Tomas Randysek)

A building of the station building.
(photo © Tomas Randysek)

A building of the depot.
(photo © Tomas Randysek)

The station building has built an enclosure walls. The weather is very good in November. And we ordered a crane for the laying of a ceiling beams. Because when it will rain the crane does not drive in the building site. A ceiling beams were custom-made according to a project. The manual manipulation to a crane cable was a work for four men. We worked very hard but the ceiling is laid.

You can watch the sky from
the station building.
(photo © Tomas Randysek)

"Pisto, do you lift it?"
(photo © Tomas Randysek)

"No, I´d rather use the crane."
(photo © Tomas Randysek)

A manipulation by the pitchwork.
(photo © Tomas Randysek)

A manipulation by the pitchwork.
(photo © Tomas Randysek)

The first ceiling beam settling.
(photo © Tomas Randysek)

The second ceiling beam in order. The system groove and tongue ensures a sufficient fixation,
but we have to put down panels hard upon itself.
(photo © Tomas Randysek)

The last panel on the left side.
(photo © Tomas Randysek)

The ceiling beams on the left side.
(photo © Tomas Randysek)

It will not rain here.
(photo © Tomas Randysek)

A more compplicated part around the chimney and stairs.
(photo © Tomas Randysek)

A longer and harder ceiling beams on the right side.
(photo © Tomas Randysek)

The ceiling beams settling.
(photo © Tomas Randysek)

"Hurah, the last packet."
(photo © Tomas Randysek)

The last ceiling beam is settled.
(photo © Tomas Randysek)

And a visual control yet.
(photo © Tomas Randysek)

The all ceiling is completed.
(photo © Tomas Randysek)

The lining for a fireside.
(photo © T. Randysek)

The workshop is ready for a roof frame instalation.

The steel lintel and beams
on the entering wall.
(photo © Tomas Randysek)

The side wall.
(photo © Tomas Randysek)

The ceiling timbers.
(photo © Tomas Randysek)

The window lintel.
(photo © Tomas Randysek)

The longitudinal timber.
(photo © Tomas Randysek)

A roof of the workshop preparing.
(photo © Tomas Randysek)

A completion of the depot.

A panel board installing.
(photo © Tomas Randysek)

A panel board installing.
(photo © Tomas Randysek)

A depot from the inside.
(photo © Tomas Randysek)

A door mounting.
(photo © Tomas Randysek)

A door mounting.
(photo © T. Randysek)

A door mounting.
(photo © Tomas Randysek)

The window.
(photo © Tomas Randysek)