The enclosure walls of the workshop are built.
Jano and Pista are preparing a lintels above windows.
A roofing of the depot continued, a shingel was glued onto the battens.
The workshop has built an enclosure walls, a rim was concreted and a roof
frame will laid. A traverse in a place of the portal gate was concreted. A walling
of the station building is proceeding. The depot roof was pawe with a shingel and
a side walls are facing by a thick chipboards.
The station building has built an enclosure walls. The weather is very good in
November. And we ordered a crane for the laying of a ceiling beams. Because when
it will rain the crane does not drive in the building site. A ceiling beams were
custom-made according to a project. The manual manipulation to a crane cable was
a work for four men. We worked very hard but the ceiling is laid.