The formwork is laid up to terrain height. The steel rebars are inserted between
component lines. The blocks are glued by only thin layer of construction adhesive.
All blocks will fill with concrete from mixer truck with conveyor belt in the end.
It pass the time substantially
The mixer truck with 16,5 metres conveyor belt was used for fill formwork with
concrete. Particularly time savings was the real reason for use this technology.
Eighteen cubical metres were moved in three hours. This manual work would by very
hard for Jano and Pista. We used this gained time for aboveground part bricking,