Jarek Grega welded rebars for reinforcement of the round-house ring beam.
(photo © Tomas Randysek) |
|
|
Perimeter walls bricking.
(photo © Tomas Randysek) |
|
Preparation for gateposts fitting.
(photo © Tomas Randysek) |
|
|
Carpenters started with preparation of wooden elements for round-house.
Mr Plachy is carving tenon joints for gateposts fitting. |
|
(photo © Tomas Randysek) |
(photo © Tomas Randysek) |
(photo © Tomas Randysek) |
|
(photo © Tomas Randysek) |
|
|
 |
|
|
|
|
Bricking of perimeter walls and window lintels fitting is continuing. |
|
|
Round-house perimeter walls.
(photo © Tomas Randysek) |
|
Jano is mixing building glue.
(photo © Tomas Randysek) |
|
|
Sticking and cutting of the blocks.
(photo © Tomas Randysek) |
|
|
Cutting and fitting of the window lintels.
(photo © Tomas Randysek) |
|
|
 |
|
|
|
|
The round-house.
(photo © Tomas Randysek) |
|
|
 |
|
|
|
View of the workshop and station building.
(photo © Tomas Randysek) |
|
|
Jano is bricking dividing wall in the round-house.
(photo © Tomas Randysek) |
|
Bricked dividing wall.
(photo © Tomas Randysek) |
|
|
Visible ending of the roof frame are abraded and painted.
(photo © Tomas Randysek) |
|
Boards for round-house roof covering.
(photo © Tomas Randysek) |
|
|
 |
|
|
|
|
We ordered mixer truck with conveyor belt for concreting of the round-house ring beam.
Pista secured supply of concrete into blocks, Jano and Jarek tamped and smoothed it. |
|
Conveyor belt.
(photo © Tomas Randysek) |
|
|
Concreting of the round-house ring beam.
(photo © Tomas Randysek) |
|
Pista.
(photo © Tomas Randysek) |
Jarek.
(photo © Tomas Randysek) |
Jano.
(photo © Tomas Randysek) |
|
|
While Jano and Jarek tamped concrete, Pista moved walking boards them.
(photo © Tomas Randysek) |
|
|
Preparation for gateposts fitting.
(photo © Tomas Randysek) |
|
|
Painting.
(photo © Tomas Randysek) |
|
|
 |
|
|
|
|
Fitting of the gateposts.
(photo © Tomas Randysek) |
|
Detail of the footing.
(photo © Tomas Randysek) |
Detail of the upper frame joint.
(photo © Tomas Randysek) |
|
|
Bonded elements of the roof frame.
(photo © Tomas Randysek) |
|
|
 |
|
|
|
Front part of the round-house.
(photo © Tomas Randysek) |
|
|
Next roof elements are ready for assembling.
(photo © Tomas Randysek) |
|
|
 |
|
|
|
|
Roof growed up above perimeter walls.
You can see great progress during three days, although roof construction is relatively complicated
and carpenters have to constantly something cutting. |
|
|
Building of the roof is continuing. Detailed photos show relatively complicated construction.
(photo © Tomas Randysek) |
|
Beam fastening.
(photo © Tomas Randysek) |
Check measurement.
(photo © Tomas Randysek) |
|
|
Cutting of the roof construction.
(photo © Tomas Randysek) |
|
|
Part of the roof construction settling.
(photo © Tomas Randysek) |
|
|
Connection of the sewage system from workshop.
(photo © Tomas Randysek) |
|
|
The sewage system was immediately backfill by thick layer of sand.
(photo © Tomas Randysek) |
|
|
Not a trace of excavation. Everything is covered and rearranged.
Only sewage stack indicates pipe line.
(photo © Tomas Randysek) |
|
|
 |
|
|
|
|
Cutting and nailing of the tiling battens.
(photo © Tomas Randysek) |
|
|
Lower exposed side is painted.
(photo © Tomas Randysek) |
|
|
 |
|
|
|
|
The Christmas is coming and our boys want to make environment more pleasant.
They got pine limb and made a Christmas tree from its. These brown stains are decorations,
not ferruginous needles because boys had only spray orange marking paint. |
|
Christmas decoration.
(photo © Tomas Randysek) |
|
|
Building of the round-house´s roof is in full swing, but we do not manage roof an all round-house until the end of year.
We have to cutting "to measure" too much. |
|
Building of the roof is continuing.
(photo © Tomas Randysek) |
Completed parts are protected against rain.
(photo © Tomas Randysek) |
|
|
Carpenters must cut every particular lath to the correct angle before fastening on the roof.
(photo © Tomas Randysek) |
|
|
Mr Plachy is fastening remaining gatepost in the meantime.
(photo © Tomas Randysek) |
|
|
|
|
Last pre-Christmas working day. Jano and Pista are on holiday.
Tinsmith Mr pavelka is installing a metal plates on the skylight of the round-house.
Carpenter Mr Plachy is placing last top beams. |
|
View of the round-house.
(photo © Tomas Randysek) |
Roof frame.
(photo © Tomas Randysek) |
|
|
Tinsmith in the action.
(photo © Tomas Randysek) |
|
|
Carpenters in the action.
(photo © Tomas Randysek) |
|
|
|